              Contracting module is an addon module that turns general modules into dedicated business solution, as Contracting business Bos can manage simple/advanced projects , through customization or setup you have a complete set of tools to manage and execute your project, no matter what your field is, thanks to contractor profile you can customize this module to adhere your field of activities at general level & specialized level which determine different branches needed such as production, inventory …etc, you may choose different modules that suite your business, for instance you may choose inventory with manufacturing only,or complete project management, you can add full accounting/ financial management accounting module , you can add HR module …etc, simply you have the chance to customize your solution which according to your choices will provide
- categorizing your projects would work as a starting point for a different type of projects you deal with, you may have construction, exterior, interior ......etc.
- for each category as a profile you have the ability to determine HR hierarchy which shape your data follow between project team, financial profile will determine different costs(indirect), profit margin, project administration weight.
- through the files section you can specify different files used project wide , primarily drawing, final drawing, calculation sheets ...etc.
- reports used during the project life span which is used to retrieve data from the site to technical administration by project cast can be added with no limit for quantity or contents, you just add the template which will be used in the selected project.
- different official documents such as contract, conditional statements, can be added with no limit , you can have multiple templates for contract or conditional statement which could be used with any project.
- project time lining main frame which determines different phases the project goes through and shapes your project management section.
- 
                      productions phases play the main role in this module through which you will design your field of business. - you register different technical phases used through a given project category for instance this phase might be the painting phase, through the process you can register phase order in the execution model, register estimated time for that phase (per unit), assign raw material ratios (per unit), register human & machine resources (per unit).
- you can have a lag period, you can have an accelerator, you can have raw material optional or forced.
- as by designing your phase you still got more power to determine different characteristics of this phase.
 
- products can go through the quality assurance step or just be stocked.
- with a powerful formula engine, you are the one to design relations between different information.
- to make it simple, the way you plan, review, and execute any project, all deal with information, to achieve a specific goal you have to go through a series of steps (phases), using resources, consuming time, you statically assign resources to a phase but some resources are impossible to be assigned statically such as time consumption which the base line for the whole project.
- here comes the role of the formula engine which takes control of different data from different sources and manages relations in-between.
- for instance, for painting one square meter you need 1 Kg of paint as raw material, you need a brush (with a productivity of 1 M / hour) as a tool, and you need a painter (with a productivity of 0.5 M / hour)as man power, but what about what it takes to paint a 1000 M2, what time needed, how many painter, how many brushes, when a certain brush would be replaced ??????.
- the formula engine takes the total size as data entry by the user through registering project data, processes phase static characteristics which tell paint buckets needed, painter and brushes needed, and with productivity of each item we got a basic time for execution trough a simple mathematical equitation dividing total meters by least productivity by quantities of resource, this equitation is controlled by you.
- same for quantities of brushes as one brush will paint 100M before it is fully consumed, with the time generated above we have the total time for painting for one brush which by dividing by consumption rate gives the total brushes needed.
- simple mathematics you always do will be just hard written to your software once and execute as many projects as you use, and with computer systems it can go further beyond your imagination.
 
 
          define line of business (interior, exterior , construction
through customization you can transform your field so easily, for construction you define different sections of projects such as (conceit, carpentry, plumbing, …etc) or for the specialized field you can define main power circuit assembly, wiring, installation, with the ability to sub-divide for deeper management
manage project categorization and profiling (different lines of projects)
you can manage projects at many levels of categorization, you may have authorities / private projects, you may have enterprise / small business, or you may have a decoration line, or construction line, with full customization for those projects underneath each category
manage project files, reports, contracting, and different documents
official documents and official documents cycling and ordering have an important rule in any business especially large scale business like contracting, you have the right tool to design your reports, designate employee responsible
manage subcontractors in multi mode
with the subcontractors section you may choose to have your subcontractors categorized according to the field of business which would be the key role in managing contractors in different aspects, specific group of contactors for man power, materials, duties, managing different fees and requirements, management at group of projects, a specific project, group of contractors, specific contractor
manage project technical analysis breaking down structure
with project management you have a complete set of tools to design your break down structure in multi demission, with free design you can have your traditional break down or you may have your own definition of WBS for instance you can manage a compound at villas quantities, the field of specialization, even on the product level
manage multi/unlimited levels of breakdown
with unlimited leveling you have the chance to design your project to provide a complete picture of physical tasks, for instance, a group of buildings can be a root level that hosts sections a,b & c as sub level, which has a building that span multiple floors which span appartements which span multiple compartments
Production specification and attributes including raw material, man power, machine power and different resources
You may end up with leveling with a product or phase such as painting a room which can be the root level for raw material and resources usage, so defining a 1 Meter usage of man power, tools, paint would be the base line for different project aspects
Strong profiling for different resources including productivity and time allocation
Different resources are allocated to production unit with regard of time dimension so you have a clear path for your tasks in the project
Free modeling capability (specification not drawing)
For a better understanding of modeling consider a column that takes a pharaonic style, you can have this as a standard model that consists of different predefined models or raw materials which facilitate material usage and physicalize your project
Strong time scheduling, planning, and allocation for project life span
Major part is time planning which through different sections had the frames required, a product of your project or a phase uses different resources on a time frame per unit which can be finalized in time lining through ordering and sorting different products or phases in your project time frame
Job orders and batches management and follow up including quality assurance
As you draw your time line you have the execution time line which will be the major part of project processing, and for flexibility, you have the task reorientation in job or task order which you can freely design and allocate
Team work management projects wide with admin structure adhered
As tasks are designed you have your team work also per location and can be assigned tasks that can be sub assigned by team admin or levels to sub levels reaching the final level of workers and co-workers
general modules tailored
for contracting field include Accounting, Inventory & Human resources, Procurement so each module adhere tasks required by contracting firm
Powerful communication assets
connecting different departments and sections including messaging, alerting and time lining, with automation facilities turning your app to data center routing information between your different sections
 
 
          SO what... ?
you are a few steps away to have your solution we offer analysis for your business , presentation for available solutions and finally evaluate and recommend a solution for your own business.
 
            